Shared from Thereish

Harbourline Workshops

6 Quayside Road, Port Ashby

Description

Ran power to the three new heat pump outdoor units on the roof. The cable runs along the parapet in conduit, clear of the flues, with a rotary isolator at each unit. All three units tested and running.

Products

  • Rotary isolator× 3
  • Conduit 20 mm, 4 m× 6
  • Saddle× 30

Photos