Harbourline Workshops
6 Quayside Road, Port Ashby
- Wed, 14 Oct 2026
- 9:10 am – 2:45 pm · 5h 35m
- 12 km
Description
Ran power to the three new heat pump outdoor units on the roof. The cable runs along the parapet in conduit, clear of the flues, with a rotary isolator at each unit. All three units tested and running.
Products
- Rotary isolator× 3
- Conduit 20 mm, 4 m× 6
- Saddle× 30